Keyplanby CTS

Brand guidelines

How Keyplan looks, sounds and marks a plan. It sits beside DG Vault and HM Intel as a CTS product, shares HM Intel's colours of meaning, and has a look of its own taken from building drawings.

The name

In a set of building drawings, the key plan is the small plan that shows the whole building and marks where you are. That is the product's job: show the crew the whole building and where the danger is. A fire safety plan also records where the keys are, which firefighters read as a second meaning.

Keyplan
Ready before the call.

Writing it

  • One word, capital K: Keyplan. Never KeyPlan, Key Plan or KEYPLAN.
  • On the CTS website and in sales material: Keyplan by CTS. Inside the product: Keyplan alone.
  • In HM Intel, a building plan is credited as "Plan from Keyplan".
  • Positioning line: Keyplan keeps a building's fire safety plan current, reviewed and in the crew's hands before they go in.

Before launch: a CIPO and USPTO trademark search. A first web search found nothing in fire safety, but an iOS home design app called Keyplan 3D exists.

Place in the CTS family

Each product keeps one kind of record. HM Intel is where responders read them. Keyplan has its own sign-up and works for an owner whose fire department does not use HM Intel.

DG Vault

Keeps dangerous goods shipping records. Used by shippers, carriers and drivers.

Keyplan

Keeps building fire safety plans. Used by owners, property managers and fire departments.

HM Intel

Puts both in front of responders: a truck by its unit number, a building by its location.

Colour

Brand colours are cool and quiet, so the colours of meaning stand out on the drawing. Meaning colours are the same values HM Intel uses, so a firefighter reads them the same way in both.

Brand

Plan ink#0F1D2B

Text, walls on the drawing, feature symbols.

Blueprint#1B5592

Primary actions, links, selection, the mark.

Drafting film#F3F5F7

Page background.

Sheet#FFFFFF

Panels and the drawing sheet.

Graphite#586474

Secondary text.

Rule#D8DFE6

Lines and borders.

Meaning

Hazard#DA2C2F

Stored hazards and emergency actions only. Never a button colour.

Approved#16A37B, text #12805F

A department's approval. Exits on the drawing.

Attention#B7791F, text #8F5D12

Returned plans and materials that cannot be matched.

ERG guide#F59E1B

ERG guide numbers, as in HM Intel.

Typography

Archivo carries the brand and the drawing: its narrow widths fit room names on a plan and its wide widths give the wordmark its weight. Inter carries the interface and every number, as it does in DG Vault and HM Intel.

Display, Archivo 650, width 104Ready before the call.
Heading, Archivo 650ZZ Demo Industrial
Drawing label, Archivo 600, width 86Chemical storage
Body, Inter 400Publishing replaces version 1 for the fire service. Its approval stays in the history.
Data, Inter 600, tabular figuresUN1791   2,000 L   ERG 154   version 2

Plan status

Every plan screen shows its status as a word, an icon and a colour, never colour alone. An approval covers one version: when the owner publishes a newer one, it starts again as owner maintained.

DraftThe owner is editing. Only the owner sees it.
Owner maintainedPublished by the owner. The fire service sees it, marked as not reviewed.
Published and waiting for the department. Blueprint, because nothing is wrong.
ApprovedApproved by the department. Always shown with who, when and which version.
ReturnedSent back with comments. The published version stays visible to the fire service.

Plan symbols

Hazards are diamonds, the shape of a TDG placard, with the class number inside. Building features are ink tags with a short code. Each one is large enough to tap with a glove in HM Intel.

3
Stored dangerous goodsNumber is the TDG class
Hazardous storage areaHatched, red dashed edge
FDC
Fire department connectionOutside wall
SV
Sprinkler control valveUsually the riser room
FACP
Fire alarm control panelAnd annunciators
KEY
Key boxWhere the crew gets keys
GAS
Gas shutoffMeter or main valve
ELEC
Electrical disconnectMain service
WTR
Water shutoffDomestic main
EXIT
ExitGreen, as exit signs are

These are Keyplan's own symbols. Before release, compare them with the NFPA 170 fire safety symbols departments may already use for pre-incident plans, and adopt those where they differ.

Voice

Plain words, sentence case, no exclamation marks. Say who, what and when. A button and its confirmation use the same verb.

WriteNot
Approved by ZZ Demo Fire Department on 9 Oct 2026, version 1.Your plan is approved!
UN9999 is not in the HM Intel data. No hazard guidance will show for this material.Oops, we couldn't find that.
Publish version 2, then: Published.Submit, then: Success.
Returned with 2 comments from ZZ Demo Fire Department.Rejected.
No fire department covers this location yet.Unsupported region.

Do and don't

Do

  • Show the drawing first, then the details.
  • Put the plan status in words on every plan screen.
  • Keep tap targets at 44 px on the web and 56 px in HM Intel.
  • Show the version number wherever a plan is shown.

Don't

  • Use red for buttons, links or the brand.
  • Imply approval with a green tick alone.
  • Show guidance for a material that was not matched.
  • Put a flame or a fire truck in the brand.